Saturday, June 24, 2023

Layout update 6/11/23


The basement has walls, and hopefully the roof goes on the house this next week.  Here is a picture of the layout area as is it right now.



Here is how I have arranged the layout at this time.   

If you click on the drawing a large version will appear. 
Since it has been a while, here is the list of Givens and Druthers.  I believe I have 
Givens 
1. It is 1949. 
2. HO scale standard gauge main line. 
3. Line runs from North Staging (KC) to Car Ferry Dock at Van Buren, AR. 
4. Within reason, modular specifications to meet Free-Mo standards 
    a. http://www.free-mo.org/standard/ 
    b. 42” minimum radius on the main line 
    c. #8 Turnouts on the main line 
5. Main cities of Joplin, MO & Springdale, AR. 
6. The town of Splitlog must be represented. 
7. 3’ narrow gauge line (Trees Unlimited) somewhere south of Springdale a. associated with a large sawmill. 
8. 30” narrow gauge somewhere 
9. 18” operating mine railroad 
10.Interchanges:
    a. ATSF, MKT, KCS, MoPac & Frisco in Joplin. 
    b. Frisco in Springdale
    c. MoPac, KCS, Frisco in Van Buren 
11.Joplin Union Station will be massively compressed, flat on the back with taller building flats attached to the back. I will have to do a drawing to make that make any since. 
 
Druthers 
1. Gulf Oil refinery somewhere south of Joplin. 
2. 36” aisles 


The layout sections are 26' in depth except for at Van Buren where it is 33".  Almost all section of the layout can be operated from both sides.  The only exceptions are this time are Joplin and the section with the large sawmill.  The concept for those two sections are shown below.

For some clarification on the Joplin section, here are some concept drawings.


The station and hotels will sit where indicated.  The Joplin station track side will have some depth to it, but the hotels will be flats.  I will have to get an artist to draw the hotels, as pictures of the back of the hotels are sketchy or non-existent.  I plan on mounting the hotel drawings on black foam core to give them some semblance of depth.  The total depth, as currently planned, will be about 6", and the length will be somewhat longer the 12", and about 7" tall.  The dark blue is the main line, and the light blue are passing sidings.


Between Joplin and Springdale the elevation of the main line will rise 3-4 inches, and this module is just south of Springdale.  Again, the standard gauge main line is in dark blue.  With the exception of this section, the layout could be run as double track, as there are passing sidings the entire length.  The 3' gauge track and the sawmill are on the upper portion blocked from this side by trees, lots of trees.  Viewing from this side, there is an 18" (Z scale track) mining railroad at zero elevation and it loops under the standard gauge and the sawmill.  Also, at the far right, you can see a small red section, that is the 30" gauge railroad that will be hauling the mined product away.  What are we mining, maybe unobtanium, maybe Vibranium, maybe?


No comments:

Post a Comment